Climate risk assessment in the ASRS era - 100% Renewables

Climate risk assessment in the ASRS era

One area that continues to cause confusion in AASB S2 climate risk assessments is scenario analysis.

A common question is:

Which SSP should we use for the low-warming scenario, and which SSP should we use for the high-warming scenario?

For example:

  • 5°C → SSP1-2.6?
  • 2°C → SSP2-4.5?
  • 3°C+ → SSP3-7.0 or SSP5-8.5?

This can lead to unnecessary complexity, additional modelling and cost, without necessarily improving the quality of the climate risk assessment.

Warming level ≠ SSP pathway

The key point is that a Global Warming Level (GWL) is not the same thing as an SSP pathway.

For Australian mandatory climate reporting, AASB S2 requires scenario analysis to consider at least:

  • a 1.5°C low-warming scenario, and
  • a higher-warming scenario of 2.5°C or above.

However, this does not mean that each warming level requires a different SSP dataset.

Australia’s climate projection datasets provide information at specific global warming levels, including 1.5°C, 2°C, 3°C and 4°C. These projections can be derived from the same modelling pathway, such as SSP3-7.0.

This distinction matters because a warming level describes the extent of global temperature increase, while an SSP-based emissions scenario describes a possible trajectory of socioeconomic development, emissions and climate change over time.

Don’t hunt for data you don’t need

This distinction is particularly relevant when undertaking asset-level physical climate risk assessments.

Some pathways, such as SSP2-4.5, may not provide the same level of detail or readily available data for all hazards, locations or climate variables.

Where suitable physical climate projections are available at the required warming levels from SSP3-7.0, there may be little value in introducing additional datasets simply because another pathway appears to better match the scenario.

However, the selected projections must adequately represent the relevant hazards, locations and assessment time horizons. Some risks, particularly sea-level rise, depend on the warming trajectory and accumulated warming, rather than the global warming level alone.

This approach is most appropriate where the selected global warming level projections are suitable for the hazards and time horizons being assessed, and where any limitations arising from the underlying emissions pathway are understood.

Physical climate data is only one part of the scenario

Using SSP3-7.0-derived physical climate data at a 1.5°C warming level does not mean SSP3-7.0 itself becomes the organisation’s 1.5°C transition scenario.

A climate scenario is broader than the physical climate dataset. A 1.5°C scenario may also involve assumptions about:

  • climate policy and regulation
  • the pace of decarbonisation
  • energy markets and carbon pricing
  • technology development & adoption
  • consumer behaviour and market demand

These assumptions help define the transition risk environment and its potential implications for an organisation.

So it is useful to separate three things:

  1. Warming level: the magnitude of global temperature increase being assessed
  2. Physical climate dataset: the projections used to assess hazards such as heat, flooding, drought and bushfire
  3. Transition assumptions: the policy, technology, economic and market changes associated with the scenario

These elements should be consistent, but do not need to come from the same SSP pathway.

Focus on decisions, not datasets

The purpose of AASB S2 scenario analysis is not to find the “perfect SSP”. It is to assess how resilient an organisation’s strategy, assets, operations and business model may be under materially different climate futures.

For example, an organisation assessing climate risks across multiple facilities may be able to use the same physical climate projection framework to examine exposure at 1.5°C and 3°C warming levels, while applying different policy, energy market and technology assumptions to assess transition risks under each scenario. The transition assumptions should remain consistent with the broader scenario.

From our experience, the challenge is rarely a shortage of climate projections. It is translating those projections into an understanding of which assets and operations are exposed, how risks may affect costs and service delivery, and what decisions need to be made in response.

More climate modelling does not necessarily produce a better climate risk assessment. The real test is whether the analysis changes how an organisation manages its risks, invests in its assets or plans for the future.

 

If you need help developing a climate transition strategy and action plan, or a climate risk assessment, contact Yusi, Barbara or Patrick today to learn how we can support your transition.

Feel free to use an excerpt of this blog on your own site, newsletter, blog, etc. Just send us a copy or link and include the following text at the end of the excerpt: “This content is reprinted from 100% Renewables Pty Ltd’s blog. 

Related Articles

Subscribe To Our
Net Zero Newsletter

Get monthly cutting edge energy, carbon and net-zero insights delivered to your inbox for free

Thousands of your peers are already reading it.

Just one more step...

Please enter your name & email to download for free